Skip to main content

Search the Special Collections and Archives Portal

upr000350 153

Image

File
Download upr000350-153.tif (image/tiff; 26.84 MB)

Information

Digital ID

upr000350-153
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    RELOCATION WORK PER AGREEMENT C.L.D, 11342 Section Description Remarks 5(a) Construct 39" pipe line between points A & V and V & K Under Spec. 1, Fisher Contracting Co, Completed October 18, 1955, 5(b) Construct 24" pipe line between points K & E Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* 5(c) Construct 8" pipe line between points I & D Under Spec, 1, Fisher Contracting Co. Completed October 18, 1955. 5(d) Relocate pump station from point HH to point near R Removed under Spec. 1, Fisher Contracting Co. Abandoned and not re-installed at point R. Completed October 18, 1955* 5(e) Construct 14" pipe line between points S, T and U Under Spec. 1, Fisher Contracting Co, Completed*. October 18, 1955. 5(f) Construct 6” pipe line between J & 00 (if not already constructed) Constructed prior to purchase. 5(g) Construct power line between points D & Y and Y & V Not necessary. 5(h) 5 (i) 5( j) 5(k) 5(1) Remove pipe line between points KK & LL Remove pipe line between points II & JJ Remove power line between points AA & BB and FF & HH Remove power lines, telephone circuits and telemeter wires between points CC & GG Remove pipe lines between points A & E, A & K, and R & HH Under Spec, 1 , Fisher Contracting Co, Completed, _ October 18, 1955. Under Spec, 1, Fisher Contracting Co, Completed*. October 18, 1955. Removed by Southern Nevada Power Co, Complete December 1955* except trans­former pole at old pump sta, site HH, Removed by Southern Nevada Power Co, Complete December 1955, All except line between R & HH removed under Spec. 1, Fisher Contracting Co. Completed October 18, 1955* Line from R to HH left in at request of U. P., subject to granting of suitable easement,