Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
RELOCATION WORK PER AGREEMENT C.L.D, 11342 Section Description Remarks 5(a) Construct 39" pipe line between points A & V and V & K Under Spec. 1, Fisher Contracting Co, Completed October 18, 1955, 5(b) Construct 24" pipe line between points K & E Under Spec, 1, Fisher Contracting Co, Completed October 18, 1955* 5(c) Construct 8" pipe line between points I & D Under Spec, 1, Fisher Contracting Co. Completed October 18, 1955. 5(d) Relocate pump station from point HH to point near R Removed under Spec. 1, Fisher Contracting Co. Abandoned and not re-installed at point R. Completed October 18, 1955* 5(e) Construct 14" pipe line between points S, T and U Under Spec. 1, Fisher Contracting Co, Completed*. October 18, 1955. 5(f) Construct 6” pipe line between J & 00 (if not already constructed) Constructed prior to purchase. 5(g) Construct power line between points D & Y and Y & V Not necessary. 5(h) 5 (i) 5( j) 5(k) 5(1) Remove pipe line between points KK & LL Remove pipe line between points II & JJ Remove power line between points AA & BB and FF & HH Remove power lines, telephone circuits and telemeter wires between points CC & GG Remove pipe lines between points A & E, A & K, and R & HH Under Spec, 1 , Fisher Contracting Co, Completed, _ October 18, 1955. Under Spec, 1, Fisher Contracting Co, Completed*. October 18, 1955. Removed by Southern Nevada Power Co, Complete December 1955* except transformer pole at old pump sta, site HH, Removed by Southern Nevada Power Co, Complete December 1955, All except line between R & HH removed under Spec. 1, Fisher Contracting Co. Completed October 18, 1955* Line from R to HH left in at request of U. P., subject to granting of suitable easement,