Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
LOS AHGELES AE D SALT LAKE RAILROAD COMPANY Sheet 1 Property embraced in Contract Audit No* 7322 L.A., with the Las Vegas Land and Water Company A s* Additions B » Betterments i Date aa •$ •• •• • * : w.o. Bo. t Class and size of pipe aa a aa aa: Bo. of : units aa a,aa ? a1 Investment cost ••a a Original cost in place as of to date of property December 31. 19**9. Si ze aaaa Kind aa: Units aa a• Recorded amounts t Estimated amounts * Total lUnit price* Total : original cost $ ~ T “ $ $ 1936 6gl* 2**" Transite L. Ft. 977 6,001.**0 A 6,001.**0 6,001.**0 19 U6 3180 2**" H it *100 5,358.66 A 5,358,66 5,358.66 19 H6 31 so 2**“ tt ? **5** 5.931.*a B 13.*<0 6,083.60 :: 6.083.60 Total 1831 17,291.**7 11.360.06 6.083.60 17.1*1*3.66 191*2 2013 20« II L. Ft. 3301* 26,761.83 A 26,761.83 26,761.83 19te 2029 20" H N 72 872.71 A 872.71 872.71 Total 337S 27.63**. 5** n . 27,63**, 5** 27,63U. 5** 19te 2013 18" H L. Ft. 687 5,162.12 A 5,162.12 5 ,162,12 19 1*6 3iso 18" H H 166 _ 1,513,09 A 1.513.09 1.513.09 ... Total 853 6.675.21 6,675.21 6.675.21 1936 68k 16" H L, Ft. 3607 13.597.59 B **.02 1**. 500.1** ll*. 500.1** 19 H6 3180 11*" ii L, Ft. 219 1,330.78 B 6.1*3 1 ,1*08.17 1,1*08.17 19*8 **261 1 H" it H 976 _ 5,396,36 A 5,396,36 5,396,36 .. Total 1195 6.727.1** _ 5,396,36 1.1*08.17 6.80**,53 1936 68** 1 2 " H L. Ft. 1280 2,1*16 .38 A 2,1*16.38 2,1*16.38 19te 1815 1 2 " ft B 17** 636,36 A 636.36 636.36 13k6 3180 1 2 “ II tt 9**1* 3 .58**.02 B **.00 3.776.00 3.776.00 Total 2398 6.636.76 3,052.7** 3.776.00 _ _ 6.828.7** 19 ^2 1815 2**" Welded Steel L. Ft. 95** **.622.07 B 6.02 5.7U3.08 5.71*3.08 1911 IO53 l2 " Reinf. Concrete B 1217 1 .083.96 A 1 .083.96 1.083.96 1929 82 U8 36" Cast Iron 1. Ft. **1 2,8****. 3 6 A 2, 8****. 36 2, 81*1*. 36 19U2 2013 36" H 11 s.H. H 12 118.07 A 118.07 118.07 191*6 3180 36“ b n B 16 ... 369.55 A 369.55 369.55 Total 69 3.331.98 3,331,98 3,331.98 _ _ 1929 82U8 2U" Cast Iron L. Ft. 57 8 11,120.85 A 11,120.85 1 1 ,120,85 1929 8577 2l*“ B It 11 9092 61,098.56 A 6l.O9 g.56 61,098.56 1936 68U 2**« h n B 85 235.98 A 235.98 235*98 19 1*6 3180 2l*" B H N 10697 153,933.86 A 153.933.86 153,933.86 Total 20**52 aa6.389.35 5 226.389.25 226.389.25