Description

Plans and detailed cost estimate for covering over the Big Spring

Digital ID

hln001025

Physical Identifier

Box 1 Folder 1 J. Ross Clark Las Vegas Springs 1911-1921 59 PP
    Details

    Citation

    hln001025. Union Pacific Railroad Collection, 1828-1995. MS-00397. Special Collections and Archives, University Libraries, University of Nevada, Las Vegas. Las Vegas, Nevada. http://n2t.net/ark:/62930/d16t0kw6k

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at?special.collections@unlv.edu.

    Standardized Rights Statement

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Digital Processing Note

    Manual transcription

    Language

    English

    Format

    application/pdf

    Estimated cost of laying 12 Inch concrete pipe from intake of Main pipe at Reservoir to Big Spring, and erecting Housing over Big spring, Las Vegas, Nevada. Labor: Pipe Line excavating for pipe line. 600 yards @ .25 150.00 Laying pipe - 2860 ft. @ .12 342.00 Building trestle. 35.00 Drayage - 99 Tons @ 1.00 99.00 626.00 superintendence, 10% 62.60 688. 60 House Over spring Placing forms and excavating, 300.00 Placing concrete - 50 yards @ 4.50 225.00 Putting on roof - 3000'BM 8.00 24.00 Drayage - 88 Tons 1.00 88.00 637.00 Superintendence, 10% 63.70 700. 70 1389.30 Material: Pipe Line material for trestle-per detail. 30.81 12"Reinforced concrete pipe-2580 ft. 60/1548.00 Superintendence, 10% 157.08 1736. 69 House over spring Form lumber - per detail. 63.49 Lumber - as per detail Cement - 50 barrels @ 117.50 Gravel - 45 yards @ .50 22.50 258.72 Superintendence, 10% 25.87 284 . 59 2021.28 freight - Los Angeles to Las Vegas, 1025.00 Total, $ 4435.58 Summary Labor - 1389.30 Material 2021. 28 Freight- 1025.00 $ 4435.58 ?-Engineer M. of Way. Los Angeles, February 1st, 1911. L.A.Form 30-597 Bill of material for 12 ' pipe pipe line to, and house over Big Spring, Las Vegas, Nevada. Pipe Line 26 pcs. 4x6x12' ROP - Creosoted-Piles - For trestle 16 " 3x6x16' ROP - Stringers - " 4 " 4x16x12' " - Caps " 7 " 2xl;xl6' " - walk " 2580 ft. 12 ' Reinforced concrete pipe 50 lbs. 40a nails 26 " 8d nails House over Spring 800 pas. 1x6x8' ROP - Form Lumber 800 1.ft.2x4 - ROP 22 pcs. 2x10x24' ROP - joists 12 " 2x10x18' ROP - Joists 140 1.ft. 2x10 ROP - Caps 1700'Bk 1x6 - HOP - 6' - 12' or 18' lengths 50 Bbls. Cement 45 yds. concrete gravel 50 lbs. Nails com - 8A Los Angeles, February 1st, 1911.