Skip to main content

Search the Special Collections and Archives Portal

upr000338 62

Image

File
Download upr000338-062.tif (image/tiff; 26.12 MB)

Information

Digital ID

upr000338-062
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Additions to the above lines and changes in size have been made since the origin al in sta lla tio n , but the record shows no adjustment in Capital Account to cover these changes and i t i s , therefore, assumed that they were made under Operating Expenses. Labor Matl.______ Total 2" black pipe water pipe lin e , including 20* o f 1 -1 /4 ", 22f o f 3 ", 100* o f 1/2“ blade pipe connections with a ll fittin g s complete, l i n . f t . 1269 #229.07 #272.30 Interest during construction ___________ 4.64 #506.21 (20) ^ork Order 1186. completed in December 1911 Construction o f water lin e from 16" supply lin e to bunk houses Hos. 3 and 4 Labor & Mat *1. 1" W .I. water pipe lin e with fittin g s complete in p la ce, (estimated ledger value) l i n . f t . 231 # 50.36 s /4 " W .I. water pipe lin e with fittin g s complete in p la ce , (estimated ledger value) l i n . f t . 20 3.76 # 54.12 (35) Tenements A, B and C were constructed under Woik Order 1070, completed in August 1911 and the work o f connecting these buildings with water service from the 16" supply lin e was most probably performed thereunder. The d etail o f charges does not permit identifying but one item o f pipe lin e material and estimated ledger value is therefore given. 1" pipe lin e with fittin g s complete in p la ce, l i n . f t . 420 | 91.56 (20) Tenement E. was constructed p rior to June 30, 1914, and estimated ledger value o f pipe line serving i t is given. 1" pipe lin e and fittin g s complete in p la ce, (estimated ledger value) l i n . f t . 182 #39.68 (20) Total ledger value o f pipe lines serving bunk houses, tenements and B. &• B. Shop: # 691.57 (d) Pipe Line Serving P a cific Fruit Express Company Altho not on land leased by the P a cific Fruit Express Company, an 8" W .I. water pipe lin e taking o f f the 16” C .I. supply lin e and extending southerly to the property leased by the P.F.E. and also a 4" fir e hydrant lin e 284 f t . long east o f and p a ra llel to the 8* lin e , are owned by the P.F.E. according to contract Ai^dit Ho. 5872, dated April 13, 1926. The 4 " fir e hydrant line is not shown on station map, but Exhibit A, being part o f the contract, and a print in le tte r f i l e o f Assistant Chief Engineer show the 4* lin e in p la ce. (e) Pipe Line Serving Fhginemen*s Locker Boom M r. 8 . L . Adamson, \ Sheet H o. 88»