Information
Digital ID
man000172-069
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.4 LAS VEGAS LAMP AND WATER COMPANY TABLE G Fixed Capital SUMMARY TOTAL Estimated 12/51/48 12/51/49 12/51/50 1/ Original Cost Present-Day Cost $ 652,552 872,000 $ 805,011 $ Or, 075,204 1 q j J 12/51/49 Original Cost 12/51/49 Present-Day Cost Sparling meter 8 ” $ 842 $ 1,545 Water pump 255 450 W. I. pipe 5” 444 1,165 Welded steel pipe 6 " 14,425 19,889 C. I. pipe 2 " 575 575 4” 87,564 151,981 6 » 551,009 456,278 8 ” 200,497 281,106 1 0 " 49,798 58,000 1 2 " 88,694 110,057 16" 904 1,524 Office furniture 552 865 Chevrolet sedan 1,059 1,685 Oldsmobile " 2,725 2,675 Shop building, frame 285 1,078 Equipment & tools 507 958 Chevrolet truck 1,779 1,860 International truck 1,759 1,759 Total $805,011 $1,075,204 945,000 1/ Estimated costs as of December 51, 1950, are equal to 12/51/49 amounts plus estimated net A ’S & B ’s for 1950 in the amount of $140,000.