Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.% LAS VEGAS VALLEY WATER DISTRICT VVM R LAS VEGAS, NEVADA N0V 17 1990 TABLE NO. SO - Greeley and Hansen Report ESTIMATE OF COST - COMBINED PROJECT Water Supply Lines from B.M.I. and Lake Mead to Las Vegas, Nevada. 1 . PIPE LINES From B.M.I* elear well to Junction west of Pittman From Junction west of Pittman to 6th and Oakey Sts., Las Vegas Future Line from Pumping Sta. #1 to Junction west of Pittman TO BE CONSTRUCTED IN - M S ®.. ^ 26,400 ft. SO" x l / M steel pipe 9 $15*00 $ 396,000*^ 22,700 ft. 42" x l/4» steel pipe 9 $32.00 726,400 23,SOO ft. M-2« x 5/16" ^ steel pipe ® $35*0® 333»©O0 73,000 ft. 4o» x l/4» steel pipe 9 $32.00 $2,336,000 Engineering - Inspection - Plans Contingencies 1,955,‘loo 2,336,000 100,000 100,000 195,6©o 233,000 TOTAL GREELEY AND HANSEN $ 369,000 733.000 753,00© 1,352,000 103.000 135.000 a s $2,160,000 2,160,000 113.000 216.000 Total Pipe Lines $2,251,000 $2,669,000 $4 ,920,000 $2 ,14-0,000 $2,4-39,000 -E-S-TITOMATTHET $ 369,000 730,000 753.000 2,160,000 4-,012,000 216.000 401.000 $4,629,000