Skip to main content

Search the Special Collections and Archives Portal

upr000175 480

Image

File
Download upr000175-480.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000175-480
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

\ Las Vegas - January 31, 1949 Mr, 0. M. Cory* W 23-1-55 ( 00 - Mr, W», Reinhardt Mr, L* Jit* W h ite Mr, 1. E. Bennett) Contrast Audit Mo* 10475 of Seeember 13, 1946, ©overs agreement with Richard Toleno on extension of water main Into Block 9 of Mayfair Tract #2. Toleno la handling the construction work for Reuben Speoktor under an arrangement between themselves covering the financing* In this instance, the refund contract i» drawn with Tel esc, hut the check for the estimated coat wae drawn by Specktor. Me are sow ready to refund the difference be­tween the estimated and mutual coot sat Auditor raises the question aa to whom the refund should be made pay­able. To straighten our records, 2 asked both of these gentlemen to call at the office today and they request that an assignment be made of the contract to Specktor. from Teleno Will you please, therefore, draw up a form of assignment cowering 0/A 10475 from Richard Toleno to Reuben Specktor of 343 Worth loth Street, Las Vegas, A. 8* ftolger