Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
2 Operating Investment Expenses m Fittings and Miscellaneous Material: 1000 lbs Scrap rail (4-0 ft.) 2.23 12 eu.yd Concrete 10.68 50 sks Cement 20.00 1 Propeller #38 for 16" meter service 15.68 1 16" ML Water meter comp. 318.50 1 2" Self priming centrif. pump 120.4-8 6 tons -Fuel coal 12.60 (Cont*d) 1 795.4-7 Material Handling Cost: Purchasing Expense .4-808$ on H 882.16 71.55 Material Store Expense 6.1366$ on 3 820.88 234.47 306.02 LabEonrg:ineering-Survey for water main 29.16 Moving to Job .95 Excavation and backfill 614*27 Unload and handle material 156.40 Laying pipe 884*31 Make connection to 16" water line coaeh hydrant 27.20 Install by pass for main line meter 76.91 Build and plaee form meter and valve box 59.08 Pour eoncrete-Meter box 16" waterline 48.02 Digging ditch for water line 30.13 Strip forms-Meter and valve box 11*04 PerEsnognianle eErxipnegn-sSetsa:king water line 12.07 Hauling pipe 100.25 3$ for use of tools 58.12 2 101.49 1 937.47 170.44 SunUdnrlyoa di teamnsd: hauling material 865*45 Unload and relocate standpipe 179*56 Excavate and backfill-Replacement 1 135*56 Hauling men and tools 105*00 Lay pipe-Replacement 1 526.55 Drag line traveling to Job 59.20 Hoist-travel time and unloading pipe 64.64 Fill and light lanterns Sunday and Holiday 4*73 Make connections to existing water line 150.62 Testing 16” water line replacement 74*55 Place cribbing under trk. for water line 21.54 Clean up along pipe line 49*71 LToaaked uspc raopl dp iapned connect to new 16" 27*42 pipe line 168.35