Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
\ Water Well #11 9—24—45 of the blank pipe above the flo a t e o lla r are welded* A ll perforations are 160 mesh, 10 rows, 3* slo ts, 6® centers Started running casing at 12:17 P.M* Finished running casing at 5-17-45 P.M. 9-24-45 Cemented 10-3/4" casing C.P. at 538.19* with 60 sax of Colton 9-24—45 Portland Cement, none treated. The cement was pumped down by the r i g pumps using a 10 foot wooden spacer and two top plugs. A Halliburton mixer was used fo r mixing the cement. Prior to cementing, broke circulation fo r 3 minutes from 6:05 P.M. to 6:08 P.M. Displaced cement with approximately 302 o u .ft. of mud flu id . Some returns leaked back into the mud p it which interfered with the measurements. Left 10' of cement inside the 10-3/4"casing. Final pressure was 300# (when the plugs bumped). Normal circulating pressure was 0 to 50#. 9-24-45 Started mixing cement - 6:19 P.M. Finished mixing cement - 6:24 P.M. Started displacing cement - 6:28 P.M. 9-25-45 Finished displacing cement - 6:38 P.M. Estimated top of cement behind 10-3/4" casing is at 441*. Well started flowing water around outside of 10-3/4" at 3:00 A.M. while casing was standing eemented. M illed well 9-26-45 with mud. At 8:00 P.M. ran in and found top of hard cement at 522*. D rille d out hard cement to 530'. Finished d r illin g out cement inside 10-3/4" easing. Then displaced part of mud with water. While displacing mud, well started flowing. Cemented around outside of 10-3/4" casing at the surface with 146 sax of Colton Construction Cement. Washed lin e r. Well started flowing by it s e lf at 9:45 A.M. In stalled 12” control gates. Finished in s ta lling 12" gates at 8:00 P.M. on the same day. Well: Completed and flowing to sump 9/26/45 PRODUCING- ZONES Top Producing Zone (coarse gravel, water) ? 252' to 365* 2nd " * » 9 « « 535* to 745* 3rd H M « « # » 805* to 925*