Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
I M c N E I L C O N S T R U C T I O N C O . 5 8 6 0 A V A L O N B O U L E V A R D L O S A N G E L E S 3 . C A L I F O R N I A Union Pacific Railroad Co# Los Angelos, California January 10, 1946 2# Cant'd Occupation Mort&man Oiler Pipefitter Plumber Foreman Plumber PRoewienfro Trocoeld IOpreornawtorokre r Foreman Reinforced Ironworker R o d m a n Steamfltter Truck Driver Foreman Truck Driver Tamper Vibrator Operator Watchman Hourly Rate 1*175 1.05 1.125 1.125 1.00 tbove rates during the progress to work additional hours in order eo&ts so incurred shall be added to If there are any increases of the work, or if wS'aPe to hold labor, any/additl the guaranteed figure. Our proposal contemplates constructing the 24-ineh line in three sections, and afttSs: testing each section to backfill the trench. If for any/reason itN^s necessary/to keep additional trench open throughout the construction, the'added cost of watchman service, protection lights, and tnK&ddftional cost of maintenance of temporary roadways and detours shall be added to the guaranteed figure! 4. As set foKh in our proposal of September 21st, excavating and backflllingof tranches/is based upon dry excavation except in the immediate vi^ini^/of the pump house site. If water is encountered in the excavation, this will require pumping, shoring anri other unforeseen expense and will necessarily increase the cost of pipe laying and we will, therefore, expect to be paid actual cost for this portion of the work. 5. Our fee included within the above guaranteed maximum is $15*435* FORM 103