Skip to main content

Search the Special Collections and Archives Portal

upr000149 225

Image

File
Download upr000149-225.tif (image/tiff; 26.55 MB)

Information

Digital ID

upr000149-225
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

llr. C. B. Sexton, Chairman Public Service Commission Carson City, Nevada Dear Ur. iflexton: March SO, 1943 R-58 Referring to the Commission* s approval of various contracts submitted by Las Vegas Land and Water Company to cover extension of water mains to Defense Housing projects, particularly the one to Uayfalr Tract No. 2 covered by Commission's file No. 521 dated March 1, 1945. Separate contracts were drawn in this instance to cover Block 7 (our "MH.L.D. 900) and Block 8 (our *NI,.L.D. 878a) and separate orders were Issued by the Commission indicating approved. The 34 houses referred to in *NN.L.D. 900 are now completed but so far as we can see nothing whatsoever has been done on construction of houses in Block 8 covered by *N*.L.D. 878a. We Inquired of the contractor this morning when he expeoted to oommence construction of the houses in Block 8 and were advised that he did not intend to construct them; and that his principals, Drs. Nelson and Shipley had decided to let their option expire on this land. He stated that they are having considerable difficulty in disposing of the houses already constructed and that apparently the building of Defense houses in Las Vegas was being overdone. I attach hereto a tabulation indicating by sub­divisions the number of houses for which we have underwritten water main costs under Rule 9-C together with the investment. Z might say that this study is oonfined exclusively to Defense Housing projeots Installed under Rule 90C, and does not in­clude the large number of additional houses constructed in locations where water mains were already in place. The last six items marked (#) are not completed, nor of course, occupied although the water mains are in place on all exoept the last 177 contemplated for Huntrldge. It would appear from this that approximately 460 of these houses are now ooou-pled and 652 are not.