Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
Estimate of cost of a four-room cottage at Las Vegas, Bevada. Size 24 ’x52*# including front and rear porches, using floor plan and elevations similar to design Ho. 1, drawing lo* 15573; exterior walls of 6" concrete blocks, and ’'Ready Rock" roofing* Description Material Labor Total Excavation (House,fence posts,etc)8 c.y.©| *40 Concrete foundation, 6 c.y* 8*Chimney on brackets, 10 lin. ft. Exterior walls, 6" cone.blocks, 960so.ft Rough lumber, 3,750' B.M. flooring, 1,000* B.M* "Ready Rock" roofing,- 13 squares Finish lumber, 600* B.M* Ceiling, 400* B.M. Moulding, 320 lin. ft. Moulding, 330 " " Base, l"x8", 250 lin. ft. Win&ows&Frames, 7 2Lts. 3T0Mx4T6"xl " 1 Sits® 5'6"x4T6"xl " 2 2lts. 2*6nx3T 0!Txl Window screens, 10 Doors and frames (Interior), 8 (Front, 1 (Screen) 2 Porch screen, 60 sq,. ft. Kitchen cupboard Hardware 1/2" l/ 2" ini on tj n Tf tf Tl Tf Tf 300 206 sari ycu II Electric Cast 8.-00 1.20 . .195 34.00 43.00 3.30 55.-00 45.00 .04 .015 .12 7.50 8.50 5.00 .60 7.00 12.00 2.00 .05 Plastering, Painting, Plumbing Board fence (side and rear) 1126’ B.M. Iron fence (front and side) 65 lin. ft. Cement walk, 24*x3?, 5" thick, 72 sq.ft. Electric lights (single drop lights) 8 outlets Lglits (2 light fixtures) 1 outlet iron ventilator plates, 6"xl2M 6, per doz. Idfc supervision & contingencies OlS • mu .20 34.00 .35 .10 2.50 5.00 3.50 ’fetal estimated cost less freight Freight at commercial rate Total estimated cost plus freight at commercial rate 21.00 7.50 64.80 71.25 28.00 29.90 24.00 12.00 6.40 2.48 15.00 35.00 6.00 6»00 4.50 38.00 8.75 3.25 1.80 14.00 45.00 25.50 16.48 110.00 21.39 16 .25 2.16 11.00 4.50 1.75 65.36 3.20 27.00 4*50 122.40 56.25 16. OQ 13.00 9.00 6.00 6.40 0 A Tf 15.00 17.50 2.50 4.00 1.50 18.00 3.25 .75 1.20 6.00 49.50 24.72 35.00 16.89 6.50 5.04 9*00. .50 48.21 3.20 48.00 12.-00 187•20 127.50 43.00 42*90 33.00 18.00 12.80 4.95 30.®0 52.50 8.50 10.00 6.00 56.00 12.00 4.00 3.00 20.00 45.00 75.00 41.20 145.00 38.28 22.75 7.20 20.0 0 5.00 1.75 113.57 $719.02 $530.28 '1249.30 180.00_____ 180.00 $899.02 $530.28 $1429.30 Los Angeles, Cal., July 1, 1909.