Information
Digital ID
upr000208-011
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.% Los Angeles, January 25, 1929 9215*353 Mr. 9* X* J e ffe rs: 1928 A.F.E* 158 Las Vegas water supply inoludes 500* 0*1* 34* pipe estimated cost about $4,000. Owing to favorable bid reservoir construction w ill bare unexpended balance $10,000 which can be very advantageously applied to 1300* additional C*I* 34* pipe making 1700* new pipe between reservoir and shop grounds to ta l distance 9300*, balance 7600* included 1939 Budget item 78 in anticipation completion 1700* under 1938 author! satlon* 158 approved July 34, 1938 to include 1200* additional 34* pipe lin e which w ill bridge gap between 1928 and 1939 projects. Would appreciate authority extend lim its A.F.E F. H. Knickerbocker