Skip to main content

Search the Special Collections and Archives Portal

upr000185 50

Image

File
Download upr000185-050.tif (image/tiff; 27.18 MB)

Information

Digital ID

upr000185-050
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    January 2 1 , 1953* iff* Boye* #« Petersen 701 O&kty Blvd., Las Vegas, Nevada. Dear sir) isoeailag to our oonvereatlon a few days ago concerning Installation of water sain to serve that portion of Alta Vista Tr&ot fronting on Bonita Avenue between South Sixth and south Tenth Streets, Las Vegast we estimate it will require 1^50 LF ef 6* oast iron water main to serve the property. The esti­mated oust of eons trusting the stain is tJoQO.QO, whioh amount, pursuant to Nevada Public Service Commission Buie 9, will be subject to refund. To provide adequate fire protection, City authorities require the installation of three fire hydrants* The estimate, cost of constructing $* cast iron water lines to these hydrants is 1360.00 which amount is not subject to refund. In addition,it will be necessary that you secure from the City, at your m m expense, the three fire hydrants, the cost of which will likewise not be subject to refund. Inch of the above estimates includes a contingency of |©Jg which is to cover any unforeseen Increase In material and other cost. Our contract will provide, among other things, that you deposit the esti­mated cost of #5960.00, and, in the event actual cost of the work should be less than your deposit, the Mater Company will refund to you such excess amount. Xn the event, however, that the actual cost should exceed the amount of your deposit, jrbu will, upon receipt of bill, reimburse the Mater Company for such additional cost*