Skip to main content

Search the Special Collections and Archives Portal

upr000043 119

Image

File
Download upr000043-119.tif (image/tiff; 26.29 MB)

Information

Digital ID

upr000043-119
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    V U-l-a FEB. 24, 1943 WAR PRODUCTION BOARD Part 4500—Electric, Gas, Water, and Steau Utilities—Materials [Supplementary Utilities Order U-l-a| Supplementary Preference Rating Or­der P-46-a, as amended October 10,1942, is hereby revoked and superseded by § 4500.2, Supplementary Utilities Order U-l-a, as follows: § 4500.2 Supplementary Utilities Or­der U-l-a. Notwithstanding the provi­sions of paragraph (h) of Utilities Order U-l, service connections may be made by producers to facilities of the Army or Navy of the United States or the Mari­time Commission, upon the direct order of the Army, Navy, or Maritime Com­mission: Provided, That the total length of the main extension or the service line does not exceed 250 feet, and the total cost of materials required for the exten­sion does not exceed $1,500 in the case of underground construction and $500 in the case of other jobs. (PU. Beg. 1, as amended, 6 F.R. 6680; W.PB. Reg. 11 7 Fit. 561, as amended: E.O. 9024, 7 Fit. 329; E.O. 9040, 7 FJR. 527; E.O. 9125, 7 F.R. 2719; sec. 2 (a), Pub. Law 671,76th Cong., as amended by Pub. Laws 89 and 507, 77th Cong.) Issued this 24th day of February 1943. J. A. Krug, Director, Office of War Utilities. GPO— War Board 4000— p. 1