Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
1 tained in subparagraphs (a) to (l) inclusive of this Section 5« 2 Any contract or contracts let by the District or the 3 First Parties pursuant to this section shall require the contractor 4 to promptly commence and diligently prosecute to completion, in a 5 good and workmanlike manner and in accordance with sound engineering 6 practice, the work referred to in said contract or contracts. The 7 contract or contracts for the removal of the pipe lines and wire- 8 lines described in subparagraphs (h) to (l) of this Section 5 shall 9 provide that all salvageable material removed shall be transported 10 to and placed at such point or points upon the lands described in 11 subparagraph (a) of Section 1 as the District may designate. Either 12 party to this agreement shall be entitled to appoint a represent- 13 atlve or representatives to inspect any work during the course of 14 construction to see that said work is performed in accordance with 15 this Section 5* Said representative or representatives shall be 16 given access to all work areas, work in construction, materials and 1 7 eqjuipment which are necessary for the performance of said work. 18 it is agreed by the parties hereto that the estimated 19 cost of the work to be performed pursuant to this Section 5 20exclusive of supervision and engineering, is the sum of $____________ . 2iwithin the time and in the manner provided in Section 7 hereof, the 23District shall deposit in the escrow referred to in Section 7 said 2%um of | plus a sum equal to ten per cent (10$) there- 2^>f, the total of both of said sums being the aggregate amount of 2^___________ (said aggregate amount of $____________ is herein 2%ometimes referred to as "Relocation Fund"), 27 28 28a