Skip to main content

Search the Special Collections and Archives Portal

man000205 85

Image

File
Download man000205-085.tif (image/tiff; 26.85 MB)

Information

Digital ID

man000205-085
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

1 tained in subparagraphs (a) to (l) inclusive of this Section 5« 2 Any contract or contracts let by the District or the 3 First Parties pursuant to this section shall require the contractor 4 to promptly commence and diligently prosecute to completion, in a 5 good and workmanlike manner and in accordance with sound engineering 6 practice, the work referred to in said contract or contracts. The 7 contract or contracts for the removal of the pipe lines and wire- 8 lines described in subparagraphs (h) to (l) of this Section 5 shall 9 provide that all salvageable material removed shall be transported 10 to and placed at such point or points upon the lands described in 11 subparagraph (a) of Section 1 as the District may designate. Either 12 party to this agreement shall be entitled to appoint a represent- 13 atlve or representatives to inspect any work during the course of 14 construction to see that said work is performed in accordance with 15 this Section 5* Said representative or representatives shall be 16 given access to all work areas, work in construction, materials and 1 7 eqjuipment which are necessary for the performance of said work. 18 it is agreed by the parties hereto that the estimated 19 cost of the work to be performed pursuant to this Section 5 20exclusive of supervision and engineering, is the sum of $____________ . 2iwithin the time and in the manner provided in Section 7 hereof, the 23District shall deposit in the escrow referred to in Section 7 said 2%um of | plus a sum equal to ten per cent (10$) there- 2^>f, the total of both of said sums being the aggregate amount of 2^___________ (said aggregate amount of $____________ is herein 2%ometimes referred to as "Relocation Fund"), 27 28 28a