Skip to main content

Search the Special Collections and Archives Portal

upr000095 89

Image

File
Download upr000095-089.tif (image/tiff; 32.73 MB)

Information

Digital ID

upr000095-089
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    paid under the provisions of this Section 7, the title to said new pipe lines constructed by Union Pacific pursuant to the pro­visions of Section 3 hereof shall remain in Union Pacific. So long as the District shall continue to make the monthly payments provided for in this section, the District shall have the right to possess and use the said new pipe lines. During all the time the District shall be in possession of and use said new pipe lines, the District shall at its sole cost and expense maintain said new pipe lines in accordance with sound engineering practice. When the Dis­trict shall have paid in full to the Union Pacific the amounts re­quired to be paid under, the provisions of this Section 7, Union Pacific shall convey said new pipe lines to the District. Section 8. The Union Pacific agrees that on or prior to the sale date it will grant to the District, by separate documents, an easement or easements fifteen (15) feet in width, except as hereinafter noted, for the construction, maintenance and operation of pipe lines for the conveyance of water in the following locations shown in solid red line on said Exhibit "A-l". (a) Between points S, T and U; (b) Between points D and MM; (e) Between points E, F and G; (d) Between points F and I, and H and J; (e) Between points K and M; 20 feet in width; (f) Between points L and 0, and N and P; (g) Between points JJ and Q; (h) Between points R and Z; (i) Between points SS and TT. In the event the District shall construct aew pipe lines upon the property of Union Pacific in locations referred to in sub- paragraph (a) of Section 2 hereof, Union Pacific, upon the request of the District, shall grant to the District, by separate documents, an easement or easements fifteen (15) feet in width for the con­struction, maintenance and operation of pipe lines for the conveyance -8-