Skip to main content

Search the Special Collections and Archives Portal

upr000092 67

Image

File
Download upr000092-067.tif (image/tiff; 32.65 MB)

Information

Digital ID

upr000092-067
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

.°y c,r L r *( * . 'T-' u i pi Section 2. The Union Pacific shall have the right at any time during the effective life of this contract after giving the District sixty (60) days1, notice of its intention so to do to construct an adequate pipe line of a capacity of the existing 24-inch cast iron pipe line and 16-ineh transite pipe line shown on said Exhibit "A" by broken black and red lines of a type and size to be mutually agreed upon; and in the event the parties cannot agree upon the character of said proposed pipe line, the same shall be constructed by the Union tV ? - ' * ' ? Pacific of 3o-inch cast iron or pipe of a similar character. Said proposed pipe line shall be constructed in the location shown in a broken red and white line on said Exhibit "A" in the locations between points A and V and points V and K. Union - Pacific shall also have the right to construct a 24-inch pipe line in the location shown in broken red and white line between points K and E on said Exhibit wA n and an 8-inch cast iron pipe line in the location shown in broken red and white lines on said Exhibit "A" between points Y and D, it being understood that unless the s parties can agree upon the type of said 24-inch and 8-inch pipe lines, the Union Pacific shall construct said pipe lines pursuant to good engineering practice and of the approximate capacity hereinabove mentioned. Union Pacific shall also have the right to relocate 3