Skip to main content

Search the Special Collections and Archives Portal

upr000204 25

Image

File
Download upr000204-025.tif (image/tiff; 32.48 MB)

Information

Digital ID

upr000204-025
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    ? 1 : ... „ „ , __. Water will be diverted i.iY Description of proposed worrkkss. __ _______ — byJ L-a- -dr-i l-l-e-d-- well and distributed through a system of iron pipe lines. 14. Estimated cost of works $10,000.. gy s/_Calvin M. Cory Map filed Aug. £>> 1953 General Attorney ----- ------APPROVAL OF STATE ENGINEER This is to certify that I have examined the foregoing application, and do hereby grant the same, subject to the following limitations and conditions: an underground source as heretofore granted under Permit No. 7200 is issued subject to the terifts and conditions imposed in said Permit No. 7 2 0 0 and with the understanding that no other rights on the source,, will be affected by the change proposed herein. A substantial heaci-gate and weir must be installed at or near the point of diversion to facilitate the measurement and control of water. The State reserves the right to regulate the use of the water under this proposed change at any and all times. The amount of water to be appropriated shall be limited to the amount which can be applied to beneficial use, and not to exceed 2 .5 ______ cubic feet per second. Actual construction work shall begin on or before .December 8 , 195^ Proof of commencement of work shall be filed on or before January 8, 1955 Work must be prosecuted with reasonable diligence and be completed on or Application of water to beneficial use shall be made on or before______ December 8, 1956 . Proof of the application of water to beneficial use must !be filed with State Engineer on or before January 8, 1957 This permit to change the point of diversion of the waters of before December 8, 1955 Proof of Completion of work shall be filed before_____ January 8, 1956 WITNESS \