Skip to main content

Search the Special Collections and Archives Portal

upr000184 164

Image

File
Download upr000184-164.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000184-164
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

(o) Ry actual cost is meant the cost of all material and supplies delivered to the Job* the cost of all labor employed in connection with the installation of said water main, the cost of premiums on contractor's surety bond, Public Liability* Property Damage and Contractor’s Gontractur&l Liability Insurance* plus ten percent (lo$) for supervision and overhead* (d) The contract will further provide for refund of 35$ of the revenues derived from the sale of water to consumers located within the subdivision above referred to* taking service from the lines Installed hereunder* during the ten year period following the completion of the installation or until your cost (exclusive of the cost of the fire hydrant connections and fire hydrants) has been refunded, whichever first occurs. If the above proposal is satisfactory to you, we will upon receipt of your check in amount of 165,680, arrange for materials and upon receipt thereof proceed with the work. Should you desire to enter in private contract for the installation of the said water mains, fire hydrants and connections at your own expense and in accordance with the general specifications set" forth above, the Water Company will upon* {&} Completion of the work, (b) Receipt of bill of sale In satisfactory for® conveying title to the water mains and fire hydrant connections to the Water Company and, (c) Receipt of easement in satisfactory for®, for such water lines or fire hydrant connection®, if any, located in other than public streets, alleys or public utility easements* agree to refund to you 35$ of the revenue derived fro® the sale of water to consumer located within the tract, taking service from the water mains installed hereunder* during the ten year period following completion or until you have been refunded the actual cost of installing said water