Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.ESTIMATE FOR CONSTRUCTING CONCRETE SETTLING BASIN - M S "VEGAS, NEVADA O ffic e o f A ssistan t Chief Engineer, Los Angeles, C a lifo rn ia - Drawing No, S-235 Build concrete s e t t lin g "basin 60x14x5 and make connection to the w e ll by 40 feet o f 20 inch Redwood stave pipe, also connect to e x istin g pipe lin e A by 1816 feet o f 24 inch Redwood stave p ip e. B uild concrete sp illw ay connecting by trench about 100 fe e t long with old stream bed. D e s c r i p t i o n Excavation estimated Concrete Pipe and Valves in S e ttlin g Basin Redwood Stave Pipe 20 inch diameter ** « n 2 4 w if S pillw ay estimated C on tractor’ s Bond l-l/ 2 $ L i a b i li t y 1$ P r o fit s 10$ Engineering and Inspection 5$ In terest during Construction l-l/ 2 $ Contingencies 10$ Quantity Unit Unit Cost Amount 150 cu.yds • • SO 120.00 50 20.00 1000.00 170.00 40 l i n . f t . 3.10 124.00 1816 tt 3.60 6537.00 300.00 123.00 83.00 850.00 Contract cost o f Work— - 9307.00 465.00 140.00 935.00 Total cost o f Work---------- $10847.00 dhr/mlh Los Angeles, C a lifo rn ia November 17, 1924.