Skip to main content

Search the Special Collections and Archives Portal

upr000177 224

Image

File
Download upr000177-224.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000177-224
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

Las W H 0 * A p ril 25# W 23-1-62 Mr* L. A, imtfi ( «0 Xr« It* L. Adamson Voik Order 635 auttawised the construction of a, pipeline to 002*7109 Slock lff Paradise Village Tract for paradlst Realty Oo. at an estimated soot of 18970 whieh the sub-divider advanced under 0/A 10533 Hareh 20* 1950. Enclosed is detail of shakos to this Work Order indicating total oost to be #6290*60 plus #922.23 for firs hydrant Unas* to which should be added X0> for supervision and overhead making total oost to sub-divider S80U.11. Vs enoloss fora 183 for ref land of the difference #956.89. fhe total refundable under this contract would be #7018.88. Following le data for depreciation purpose* s & 7 feet 8-lnoh 0. 1. Pip# - #2289.00 1760 feet 6-inch 0. X. Pipe - #6993.83 Service umbers 10166 to 1$2L5 Inclusive are assigned this contract. For Hr. Adames'e information in oonpiling •AS done Quoted* prints the installation followed lines of print attached to Work Order. A* It. Folger