Skip to main content

Search the Special Collections and Archives Portal

upr000212 99

Image

File
Download upr000212-099.tif (image/tiff; 26.55 MB)

Information

Digital ID

upr000212-099
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    COST ESTIMATE of Repairing Well - Las Vegas. Nev. P 4 'in'w -A ' '3V ' RIO TIME 1. Rig up and unrig - 64 hrs. at 9*50 2. Mix mud, run in perforate csg., place | 608.00 bridge, dump cement and squeeze - 36 h r s', at 1 1.0 0 3 . Standing cemented - 48 hre. at 9*50 4 . Clean out, deepen and run liner - 396.00 456.00 48 hrs. at 1 1.0 0 528.00 #1.988.00 MOD 10-tons rotary mud 1 - load sand i 115.0 0 20.00 135.00 CASINO 32 7* - 28#, 8-5/8" casing at 1.43 per ft. 1 - 28#, 8-5/8" x 12" Baash-Ross casing adapter 307» - perforating at .50 per ft. 467.61 95.00 153.50 716.11 c e m e n t 100 - sacks of cement 60.00 BITS 1/2 - 12" Tricone at 155.00 / 77.50 PERFORATOR Rental - 1 day with transportation and expenses 150.00 TOTAL $3,126.61 L