Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
* - * W.0. No. Date Work Started Date Project Physically Completed Description of Hells and Appurtenant Facilities Referred to in Affidavits of Completion Filed with State Engineer n r (2) ( 3 T 2013 2-24-42 7-20-44 Drilling artesian Hell No, 7 at point of div-ersian to depth of 485 feet and installing therein 275 feet of 13 3/8 inch and 216 feet of 10 3/ 4. inch steel lapweld casing; cementing in top casing; also 43.3 feet of 10 inch cast iron pipe from top of well to pipe connecting with settling basin, and were made at point of diversion. Drilling artesian Hell No, 8 at point of diversion to depth of 766 feet and installing therein 510.57 feet of 13 3/8" and 283.81 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 69.5 feet of 10 inch cast iron pipe from top of well to pipe connection with settling basin, and were made at point of diversion. 2029 2-26-42 7-29-44 Drilling artesian Hell No, 9 at point of diversion to a depth of 472 feet and installing therein 280.22 feet of 13 3/8 inch and 216.61 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 70.3 feet of 10 inch cast iron pipe from top of well to pipe connecting with settling basin,and were made at point of diversion. (Note: 70.31 of 10” cast iron pipe retired under W.0. 3180) Drilling artesian Well No. 10 at point of diversion to a depth of 1250 feet and installing therein 494.30 feet of 13 3/8 inch and 376.84 feet of 10 3/4 inch, and 358.86 feet of 7 inch steel lapweld casing; cementing in top casing; also 10 feet of 10 inch wrought iron pipe from top of well to pipe connecting with settling basin, and were made at point of diversion. (Note: 10' of 10” wrought iron pipe retired under W.0. 3180) 3180 2- 7-45 6-30-47 Drilling artesian Hell No. 11 at point of diversion to a depth of 940 feet and instal ling therein 904 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 200 feet of 12 inch and 440 feet of 18 inch transite pipe f rom top of well to connect xrflth settling basin. 4261 3-14-49 8-31-49 None 4500 4-18-50 6- 9-50 None 4712 1- 9-51 1-31-51 None 4728 3-22-51 12-31-51 • None 4789 6-19-51 11-30-51 None State Engineers Permit No. (5) 10867 10868 10869 10870 ( 11249 is - TOTAL Sum stated in Affidavit to be ”At Least” the Amount Expended on Hells & Appurten-and Facilities Actual Cost of Hell and Appurtenant Facilities Described in Column (4) ------ (7) Description of Improvement Other ;Than Hells and Appurtenant Facilities (8) Cost of Facilities Shown in Column (6) ( 9 ) Total Cost W i 4 500,00 7 460.03 Installed 4*015 ft, of new pipe lines, derrick at Hell No. 7, mats at Hells -:7 and 8; 4 weir boxes, floor in'middle Spring- house, Redwood water tank and chlorinator equipment at Middle Spring, pumping equipment at Reservoir and pump at 5 000.00 11 873.66 Well N o . ^7. 46 767.04 66 100,73 4 500.00 13 348.12 Installed 3,697 ft. of new pipe lines, derricks and mats at Hells 9 & 10, weir boxes, constructed new settling basin No. 2 and raised walls of settling basin No.l, constructed valve box at reservoir, pump house at Reservoir #1, installed pump in Hell No. 4 and at Reservoir No. 10 000.00 19 232.72 1 and constructed power line. 47 609.94 80 190.78 Installed 12,240 ft. of new pipe lines and replaced 1,601 ft. of existing pipe lines,constructed reservoir, settling basin, Booster and fire pump houses, fenc- 16 277.00 18 261.47 ing, power line, and installed pumping equipment. 307 092.09 325 353.56 Constructed Booster pump house, 1,657 ft. of new pipe linos, power line and installed pumping equipment, including automatic pressure system with 2 steel pressure tanks, fencing, driveway, etc. 27 745.19 27 745.19 oa Constructed 1,534 ft. of pipe line connecting Hell No. 8 to Settling Basin. 7 644.45 7 644.45 — Constructed 41 f t. (including valves and fittings) of pipe line to connect with LVL&W Co. 2 075.80 2 075.80 Installed pumps in Hells Nos.8, 10 and 11 and constructed pump house at Jell No. 11, including power connections and equipment 18 652.06 18 652.06 Constructod pumping station, power line,j2409 ft. of new pipe lines and driveway to serve West Side District. 34 297.10 34 297.10 84 631.92 122 043.62 531 546.22 653 589.84