Skip to main content

Search the Special Collections and Archives Portal

upr000280 122

Image

File
Download upr000280-122.tif (image/tiff; 88.18 MB)

Information

Digital ID

upr000280-122
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    * - * W.0. No. Date Work Started Date Project Physically Completed Description of Hells and Appurtenant Facilities Referred to in Affidavits of Completion Filed with State Engineer n r (2) ( 3 T 2013 2-24-42 7-20-44 Drilling artesian Hell No, 7 at point of div-ersian to depth of 485 feet and installing therein 275 feet of 13 3/8 inch and 216 feet of 10 3/ 4. inch steel lapweld casing; cement­ing in top casing; also 43.3 feet of 10 inch cast iron pipe from top of well to pipe con­necting with settling basin, and were made at point of diversion. Drilling artesian Hell No, 8 at point of div­ersion to depth of 766 feet and installing therein 510.57 feet of 13 3/8" and 283.81 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 69.5 feet of 10 inch cast iron pipe from top of well to pipe connection with settling basin, and were made at point of diversion. 2029 2-26-42 7-29-44 Drilling artesian Hell No, 9 at point of div­ersion to a depth of 472 feet and installing therein 280.22 feet of 13 3/8 inch and 216.61 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 70.3 feet of 10 inch cast iron pipe from top of well to pipe connecting with settling basin,and were made at point of diversion. (Note: 70.31 of 10” cast iron pipe retired under W.0. 3180) Drilling artesian Well No. 10 at point of diversion to a depth of 1250 feet and instal­ling therein 494.30 feet of 13 3/8 inch and 376.84 feet of 10 3/4 inch, and 358.86 feet of 7 inch steel lapweld casing; cementing in top casing; also 10 feet of 10 inch wrought iron pipe from top of well to pipe connecting with settling basin, and were made at point of diversion. (Note: 10' of 10” wrought iron pipe retired under W.0. 3180) 3180 2- 7-45 6-30-47 Drilling artesian Hell No. 11 at point of diversion to a depth of 940 feet and instal ling therein 904 feet of 10 3/4 inch steel lapweld casing; cementing in top casing; also 200 feet of 12 inch and 440 feet of 18 inch transite pipe f rom top of well to connect xrflth settling basin. 4261 3-14-49 8-31-49 None 4500 4-18-50 6- 9-50 None 4712 1- 9-51 1-31-51 None 4728 3-22-51 12-31-51 • None 4789 6-19-51 11-30-51 None State En­gineers Permit No. (5) 10867 10868 10869 10870 ( 11249 is - TOTAL Sum stated in Affida­vit to be ”At Least” the Amount Expended on Hells & Appurten-and Facilities Actual Cost of Hell and Appur­tenant Facili­ties Described in Column (4) ------ (7) Description of Improvement Other ;Than Hells and Appurtenant Facilities (8) Cost of Facilities Shown in Column (6) ( 9 ) Total Cost W i 4 500,00 7 460.03 Installed 4*015 ft, of new pipe lines, derrick at Hell No. 7, mats at Hells -:7 and 8; 4 weir boxes, floor in'middle Spring- house, Red­wood water tank and chlorinator equipment at Middle Spring, pumping equipment at Reservoir and pump at 5 000.00 11 873.66 Well N o . ^7. 46 767.04 66 100,73 4 500.00 13 348.12 Installed 3,697 ft. of new pipe lines, derricks and mats at Hells 9 & 10, weir boxes, con­structed new settling basin No. 2 and raised walls of settling basin No.l, constructed valve box at reservoir, pump house at Re­servoir #1, installed pump in Hell No. 4 and at Reservoir No. 10 000.00 19 232.72 1 and constructed power line. 47 609.94 80 190.78 Installed 12,240 ft. of new pipe lines and replaced 1,601 ft. of existing pipe lines,constructed reservoir, settling basin, Boost­er and fire pump houses, fenc- 16 277.00 18 261.47 ing, power line, and installed pumping equipment. 307 092.09 325 353.56 Constructed Booster pump house, 1,657 ft. of new pipe linos, power line and installed pump­ing equipment, including auto­matic pressure system with 2 steel pressure tanks, fencing, driveway, etc. 27 745.19 27 745.19 oa Constructed 1,534 ft. of pipe line connecting Hell No. 8 to Settling Basin. 7 644.45 7 644.45 — Constructed 41 f t. (including valves and fittings) of pipe line to connect with LVL&W Co. 2 075.80 2 075.80 Installed pumps in Hells Nos.8, 10 and 11 and constructed pump house at Jell No. 11, including power connections and equipment 18 652.06 18 652.06 Constructod pumping station, pow­er line,j2409 ft. of new pipe lines and driveway to serve West Side District. 34 297.10 34 297.10 84 631.92 122 043.62 531 546.22 653 589.84