Skip to main content

Search the Special Collections and Archives Portal

upr000195 148

Image

File
Download upr000195-148.tif (image/tiff; 26.72 MB)

Information

Digital ID

upr000195-148
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Mr. Bennett 3/22/54 Page 3 based on complaints already received in our present operation, it is Imperative that this line between points A and C be constructed as quickly as possible. 7. As a means of expediting construction of line between points A and 0, I suggest the following: (a) Approval by Mr. Reinhardt of change in plan and basis of construction from deposit and con­struction by Water Company to basis of construction by private contract as Contained in my letter to Mr. James M. Montgomery dated March 8, 195*** which includes construction of portion of 8 ” main between points C and B. In this connection I am submitting herewith copy of letter from Mr. Thomas A. Campbell to me dated March 15th and copy of letter from Mr. James M. Montgomery to Mr. Thomas A. Campbell dated March 12th, both of which indicate District’s approval contingent upon their receipt of three bids, which were subse­quently sent Mr. Montgomery by the Subdivider, copy of revised estimate dated March 5* 195**# and one print of revised plan B-623 dated March 22, 195**« Work Order 7&5 already authorizes funds for this project, except on a different basis of Rule 9 agree­ment, and I do not think it necessary to re-submit to Omaha. Mr. Reinhardt’s approval will permit me to authorize Subdivider to proceed upon execution of agreement, which I will ask Mr, Cory to prepare. (b) When Mr. Cochran of Morning View Heights has commenced construction of his portion of the line in Qakey Boulevard between points C and B, I will immediately submit project for construction of 8* water main between points A and C on the basis of Company expense if at that time it la Impossible to secure an application from a Subdivider. It is my understanding that you will discuss this situation with Mr. Reinhardt and advise whether he approves of the procedure suggested in paragraph 7« L. R. Maag Attachments: 1. Map dated 3/22/54 of existing water system in Southeasterly portion of City, 2. Mr. Cochran's letter of 3/5/5** 3. Mr. Campbell’s letter of 3/15/54 4. Mr. Montgomery's letter to Mr. Campbell of 3/12/54 5. Copy of Revised Estimate dated 3/5/54 6. Print of Revised Plan B-623 dated 3/22/54