Information
Digital ID
upr000065-421
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.FORM 30-1 (Last S h e e t ) 9 - 30 - lOOM WORK ORDER AUTHORITY—Detail of Estimated Expenditures LAS VEGAS LAND AND WATER COMPANY DEPARTMENT .DIVISION location: Las Vegas, Nevada DESCRIPTION OF WORK: Construct 1560' of 8M cast Iron President’s No. Nevada water pipe to increase pressure in WestleigK v.i..,io.section Tract, McNeil Tract, Wallenzein & Wendelboe j Tract and Mountain View Tract Department .19 ___ R.AND E. ACCT. No. •ITEM QUANTITY UNIT UNIT COST LABOR MATERIAL TOTAL CHARGEABLE TO INVESTMENT ACCOUNT OPERATING EXPENSES NEW ADDITIONAL PRO PEE: 8H Cl pipe',"'"CT."T5’0" 8” Swing check valve flange 8” Flange & spigot, 12” long 8ff 90° Elbow A.B. 8n: Tee, A.Bi 8” Sleeves 8W Cross A.B. 8n Gate valves Crane No. 462 Labor C ont ingenc ie s 1560 Ea Ft 2.50 0.62.00 33.89 38.00 46.00 17.20 60.00 163.00 2.25 3 900 324 652 9 770 TOTAL 9 770 9 770 Total Estimated Expenditure _ Estimated By------------------------- Date____________________________ .19 Approved. • 9 770 .Approved •When labor or material is chargeable to both Investment and Operating Expenses show the items separately for each account.