Information
Digital ID
upr000195-210
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.3* The plans and specifications for and the location of the s&ld pipe lines shall be satisfactory to the undersigned and the cost of the work of constructing said pipe lines to be refunded by the undersigned to the Subdivider under the provisions of said Buie 9 shall be in an amount satisfactory to the undersized. 4. Said pipe lines shall be laid in public streets or alleys or on a private right of way furnished by the Subdivider to the undersigned as disclosed by a policy of title insurance to be furnished by the Sub-divider to the undersigned by the PIONEER TITLE INSURANCE COMPANY in fora satisfactory to the undersigned and with limits of liability of $1*000*00. 5* Title to all of said mains shall be vested in the undersigned. 6* Said formal contract shall contain all of the other conditions contained in the usual form of contract executed by the undersigned under Rule 9 of a aid Rules and* Regulations with persons desiring extension of water mains. Copy of provisions contained in our usual fora of contract is available for inspection in my office* Very truly your®, LAS VEGAS LAND & WATER COMPANY Acting General1' 'Manager