Skip to main content

Search the Special Collections and Archives Portal

upr000267 125

Image

File
Download upr000267-125.tif (image/tiff; 32.85 MB)

Information

Digital ID

upr000267-125
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    BOOSTER STATIONS No. 1 - West of Intake on Lake Mead 4-500 H.P. Units 10 MOD 250• TDH ea. 9 #11,1*33.00 (pump and motor) #1*5 ,7 Valves, oheek, controls, etc., pump fdns. 46,00®0® Booster Pump Ho. 1*0 * x 7®* No. 2 - Booster on 4o N Line 4-500 H.P. Units 10 MOD 250* TDH ea. 9 #11,433*0® (pump and motor) Valves, check, controls, pump fdns. Booster Pump Ho. 4o* x 7®* No. 3 - At Junction West of Pittman 4-500 H.P. Units 1© MOD 243* TDH ea. 9 #11,433*®® (pump and motor) Valves, cheek, controls, pump fdns. Booster Pump Ho. 4o* x 7®' Return pump from Junction to B.M.I. Reservoirs 1-1000 H.P. Unit 3 MOD 520* TDH 9 #20,532.00 (pump and motor) Valves, oheek, control, fdns., incl. installation pumps No. 4 - Booster on 42* line East of Las Vegas 5-5©0 H.P. Units IQ MOD 243* TDH ea. • #11,433*®® (pump and motor) Valves, cheek, control, fdns. Booster Pump House 40* x 7® r #45»7®0 40.000 20.000 #4405,,07000® 25,500 2®,5®0 10,000 #141,7®® #57,200 50,000 20,500 112 7,70®' Contingencies Engineering - Plans - Inspection Total Booster Stations TO BE CONSTRUCTED IN Iggff.... " 1W TOTAL #110,700 #110,700 105,700 1®5 ,7®0 $56,000 35,700 141,700 127,700 127,7®o 56,000 429,300 435,300 3,000 10,000 64,200 20,000 7320,,200000 (3-REEL EY AND HANSEN ESTIMATE i m — — TOTAL. m m $210,000 $210,000 163,000 163,000 #75,000 217,000 292,000 230,000 230,000 75,000 325,000 900,000 11.000 40.000 124,000 34,000 135,000 74,000 #74,000 #514,000 #533,000 #126,000 #9S3,00® #1 ,109,00®