Information
Date
1948-08-18
Description
Details of materials and prices needed to extend the water main to a new subdivision.
Digital ID
hln000795
Physical Identifier
Box 47 Correspondence File 1948
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Details of materials and prices needed to extend the water main to a new subdivision.
hln000795. Union Pacific Railroad Collection, 1828-1995. MS-00397. Special Collections and Archives, University Libraries, University of Nevada, Las Vegas. Las Vegas, Nevada. http://n2t.net/ark:/62930/d12v2g953
English
Labor: For: Philip A. Shipley Desert Spa Las Vegas, Nevada August 18, 1948 3870' - 8 C. I. Pipe @ 2.20 Ft $8514.00 3900 - 6 C. I. Pipe @ 1.50 Ft 8850.00 2 - 8 x 6 C. I. Tees @ 17.50 Ea 35.00 6 - 6 x 6 C. I. Tees @ 13.00 Ea 90.00 2 - 8 Gate Valves @ 63.00 Ea 130.00 8 - 6 Gate Valves @ 40.00 Ea 320.00 $17,939.00 9770 Ft Trench, Lay, Joint and Backfill @ 1.00 Ft 9,770.00 10% Contingencies 2,771.00 10% Overhead and Supervision 3,040.00 $33,520.00 ESTIMATE OF COST TO EXTEND WATER MAIN TO GOVT. LOT 1. SECTION 2. EAST CHARLESTON BLVD Material: