Information
Digital ID
upr000287-089
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.,„w. a ft 88 Salt Lake, Jane 25, 1954 9215-3-W Mr. E. E. Bennett - Los Angeles (00 - Mr. 0. M. Gory - Las Yegas Mr. L. E. Maag - Las Yegas Mr. Y. V, Smith - Los Angeles) Referring to your letter June 18, file 174-2, in connection with diversion of water to the existing shop well, and to the proposed new standby shop well at Las Yegas. I presume yiiistti the information furnished by Bivision Engineer in his letter of June 15, and prints furnished by Superintendent SmithlteLth his letter of June 22, will enable the prompt preparation of application. for Mr. Cory*s use I am transmitting to him 4 additional copies print showing location of the existing shop well and location of the proposed new well. You will note that Contractor Moss states there will be no change in their bid because of the delay in drilling. o /