Skip to main content

Search the Special Collections and Archives Portal

upr000179 81

Image

File
Download upr000179-081.tif (image/tiff; 26.59 MB)

Information

Digital ID

upr000179-081
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

w 2 > 3 ^ n Mr* W». Reinhardt* Referring to your letter November 22* file 1-733*** to Mr* Stoddard regarding proposed construction of pipe line under Rule 9-A to serve Westlelgh Addition* I noticed a day or two ago that the subdivider had received a carload of pipe on the ground and waft cutting ditch in advance of cur receiving Work Order authority. X asked bin to withhold any further work on the pipe line until it could he covered with formal contract so that we ban have an Inspector on the Job to he sure the pipe line is installed in accordance with A*V*V*A* specifications* This he agreed to do* See no objection to installing the line bins elf providing It is done properly hut* under this arrange­ment. we will have a drier a different form of contract* eliminating the percentages for supervision and over­head* h m ¥egas~ December 4, 1950 A* M. Folger