Skip to main content

Search the Special Collections and Archives Portal

upr000054 183

Image

File
Download upr000054-183.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000054-183
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Rate ncy ..Month % When equipped When Mot equipped, with Recirculating with Recirculating System System .... Rate $0». .. fdp Conditioning gag^Lment 21 (feeling Water fo r Air Conditioning, Refrigeration* lee Making &M other sim ilar eaclement CgyBergial (&} One-,half ton or lee®, (b) Between 1/2 and 1 tea* (©) For each ton of capacity or fraction thereof oyer mm ton. One-half' ton or leas. Between one-half and one tan For each ton of capacity or fraction thereof over one ton $ »llife..Coolem, 1 .Qom.er.glal [&}2,000 OFM capacity or less* (b) For each 1,000 CFM of capacity or fraction thereof oyer 2,000 CFM, *9© 1 .05 h,2® *50 1.80 AS 1.80 .50 2.10 *25 1.00 .50 2.00 .25 1.00 Charge for Air Conditioning Equipment and Evaporative Cooler shall he ra&de for the months of May through September. Refrigeration - Qoanarolal T&) <5e-hSx ton or lees, (b) Between one-half and one ton, (o) For each ton of capacity or fraction thereof over one ton, Xce Making: Machines T& J Oapaoity one ton or less per day, (b) For each ton of capacity or fraction thereof over one ton per day, 1.35 $Ao 1*50 6.00 iff 2.80 2.00 & o « 1.00 h.oo Charge fo r refrigeratio n and ice making equipment shall be ? aad# fo r each- month of the year*