Skip to main content

Search the Special Collections and Archives Portal

upr000338 40

Image

File
Download upr000338-040.tif (image/tiff; 25.95 MB)

Information

Digital ID

upr000338-040
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Work Order 6871. completed Deeenfeer 51. 1926 in sta ll two ven tilators on roof o f shelter over Big Springs Hew 18* Western Botary Ventilators ea. 2 Total ledger value o f water supply line* y Mr. B. L* Adamson, ^ Sheet Bo. 6* La Bor Mat*l.______Total $14*99 $110.45 $125.44 (18) $40.761*76 (2) W ell, A ir L i f t , Air Line, Between w ell and Power House and Water Line Between Well and 70.000 Gallon Water Tank Xhe water w ell is located in yard, 43*6 feet right o f Bog* Sta.9+16.0, track #35 Work Order 5278. completed June 26. 1922 B r ill 780 foot water w ell and in sta ll the rein complete a ir l i f t ; a ir lin e s , water connecting lin e and construct tower over w ell Water w ell d rille d By contract to a depth o f 780 f t * , complete with casing, li n .f t * 780 $7,973*25 Air l i f t in sta lla tion consisting o f 6* Kimball foot piece complete with frame tower, d eflector and liBerating tank, 69* o f 6M, 50* o f 8* water pipe in stalled in w ell and to liBerating tank; 206* o f 2* and 30* o f 2§* galv* iron pipe a ir lin e put down in w e ll; 224* o f 3* and 393* o f 2%" a ir lin e la id Between power house and w e ll, $227*44 1,077.87 8* water discharge pipe lin e la id from liBerating tank on top o f tower to storage tank, l i n . f t . 250 25*46 709.59 Interest during construction 515.26 $10.526.87 (18) Total ledger value o f water w e ll, a ir l i f t and piping: $10.526.87 (3) Water Softener and Chemical House Work Order 4360. consisted December 31. 1923 Construct 18,000 gallon per hour water softener, complete, 6* and 8* water lines and 12* and 16* drain lin e s ; also 20* x 34* wood frame chemical house 18,000 gallons per hour 25'x40* high ground operated, type "K* water softener and a ll necessary fittin g s complete, including motor, lighting system and a ll switches and fix tu re s, ea. 1 $1,404.24 $7,336.81 c .y . 17 100.90 3.03 c .y . 51 712.15 398.43 Excavation - common Plain concrete foundation