Skip to main content

Search the Special Collections and Archives Portal

upr000047 62

Image

File
Download upr000047-062.tif (image/tiff; 26 MB)

Information

Digital ID

upr000047-062
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Las V egas l a n d a n d W ater co m pany B E. E. CALVIN, President, Omaha. Nebr. C. C. BARRY, Auditor, Los Angeles, Cal. C. P. SMITH. Secretary, Los Angeles, Cal. W. H. LEETE. Treasurer, Los Angeles, Cal. OFFICES PACIFIC ELECTRIC BUILDING LOS ANGELES, CAL. AND LAS VEGAS, NEVADA CHARLES ADAMS, AGENT LOS ANGELES. CAL. WALTER R. BRACKEN, VICE-PRES. and AGT. LAS VEGAS, NEV. At Salt Lake City, May 9, 1925. Mr. Walter R. Bracken, Vice Pres’t., Las Vegas Land & Water Co., Las Vegas, Nevada. Dear Sir: Returning herewith correspondence received with yours of April 19, concerning water supply at Las Vegas: I sent you copy of my letter April 24 to Mr. Secrist, of the Pacific Pruit Express Company. He replies under date of April 30 as follows: "Your letter of April 24th, with reference to water supply at Las Vegas, Nevada. "The cooling tower has just heen ordered and shipment from Pittsburgh, Pa., is promised within the next week or ten days and if satisfactory movement is had to Las Vegas, the tower should be erected and in service by June 1st at the latest. "As you know, this facility involved a capital expenditure, which, in itself, occasioned a little delay, but trust the installation as above mentioned will be satisfactory." Enel CC-Mr. W. H. Comstock