Information
Digital ID
upr000267-133
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.TABLE NO. 15 INTAKE STRUCTURES ON LAKE HEAR - SOUTH SHORE \ TO BE CONSTRUCTED IN CREELS! AND HANSEN ESTIMATE i$so :m . TOTAL 1950 ~ 1^51 — w m — Cantilever Structure 250* long ? 3*0,000 ? 340,000 ? 3*0,000 ? 3*0,000 Pumping Equipment - 4-300 H.P. Units 10 MOD 136' TDH 9 $17,510.00 Valves, cheats, etc., inel. installation Valves, piping, etc., on structure 70.000 19.000 25.000 70.000 19.000 25.000 19.000 25.000 19.000 25.000 Intake Pipe Line 1900 ft. - 5*« x 5/16* steel line 9 $50.00 ft. 95,000 95,000 92,000 92,000 Controls, eto. 25,000 25,000 25,000 25,000 Contingencies Engineering - P l a n s * Inspection, eto. - 57*,000 11,000 50,000 57*,00© 11,000 50,000 571,000 11,000 50,000 571,000 1510,,000000 TOTAL TABLE 15 - ? 710,000 ? 710,000 - $709,000 ? 709,000 ESTIMATED COST OF CONSTRUCTION - EXCLUDING POWER TRANSMISSION LINES AND STATION EQUIPMENT ?3,1*1,000 ?*,001,000 ?7,1*2,000 POWER TRANSMISSION LINES AND STATION EQUIPMENT 1*1,000 223,000 371,000 • TOTAL ESTIMATED COST OF PROJECT ?3,219,000 ?*,22*,000 ?7,513,000 ?3,122,000 $*,219,000 ?7,*11,000 (*) NOTE: This cost evidently included in G r e e l e y a n d H a n s e n ’s estimate o f c o s t o f B o o s t e r Stations.