Skip to main content

Search the Special Collections and Archives Portal

upr000061 389

Image

File
Download upr000061-389.tif (image/tiff; 26.43 MB)

Information

Digital ID

upr000061-389
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

\ m EZTRAOKDTKARY OPERATING EXPEHSE —mnWLd¥mias usianoiHTjtf 1 "Tf LAS VEGAS. HBVALA TABLE HO. 1 / w.o. Late Description Amount ------lOJTfor "d8n© Year 2932 3747 1920 1922 Connecting new pipe lines Excavate and backfill; also con­ns ot and install new pipe line # 61.61 1438.53 Total - Jdmary 1. 1925 - - - 11500.15 $15 0.01 ’£¥67 1925 5589 1925 0-50 4-24-25 Temporary settling "basin and con­trol of flood waters Replacing pipe lines and renew­ing roof and fan at Springs Renew 200* of 16” wood stave pipe Total - January 1. 1926 - - - $ 3774.08 9287.68 4 810.00 |15371.90 $1537.19 6871 12-31-26 Cut roof for ventilators on Spring Hons© | 3.08 Total - Jamary 1, 1927 - - 115374.98 $1537.50 0-109 0-149 7393 192 7 192 7 11-30-27 Renew in kind 3750' of 16” wood stave pipe Repair water facilities Clean out spring and remove con­crete wall Total - January 1. 1928 $10250.00 358.00 49.44 $26032.42 $2603.24 0-208 1920 Repair water facilities Total - January 1, 1929 i 233.00 26265.42 $2626.54 8248 8577 (Hot Corap It .) Reservoir and settling basin(Est) 2300.00 23” pipe line 2220.00 $3078.54 Total - Jamary 1, 1930 $30785.42 f BOTS:- Extraordinary Op orating Expense spread over 10 £ear period Los Angeles, Calif. May 27, 1929.