Skip to main content

Search the Special Collections and Archives Portal

upr000100 87

Image

File
Download upr000100-087.tif (image/tiff; 27.02 MB)

Information

Digital ID

upr000100-087
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

february X9, 195^ Conference "between Thomas A, Campbell, James L. Beebe, end franklin T, Hamilton, regarding time schedule and steps to be taken for sale of bonds and purchase of property by Lae Vegas Valley Water District. 1* fetglnstr's report. Black and Veatch, and Montgomery. To bo ready Maroh 1. 2. Redraft of prospectus, including statement on water rights. To be ready by March 1, and printed and ready for distribution during the first week in March. To bo dons by McClain and Bsebs, except water rights statement to be secured from Lee MeXamts. 3* inwitatiaa f»r financial proposals. Draft to bo roady about March It to bo printed and ready for issuance first week in March. To be done by Beebe. Congressional acts providing for ri#ts of way, lands, etc. rights to the District and to the 2.M.Z. Draft by frank Hamilton to bo ready about Maroh It to bo introduced in the Congress by about March 15 5* Extension of time on Las Vegas Land and Water Company con­tract. Steps on this to go forward Immediately, To bo taken by frank Hamilton and by X. X. Bennett of U.P. Railroad. Every effort to be made to secure the aotual extension prior to the taking of bide. 6. Technical changes in contract with the State of Hevada. This has been sent to Allan Bible. Allan Bible is to follow through, frank Hamilton is to keep eheeklng on this for determination. 7* Opening proposals on bonds. Between March 22 and March 31. Data to bo flxod when engineers1 report and prospectus arc ready. This is Beebe's responsibility. 8. Plans for takeover of water system. These includes (a) Escrow instructions. These are to be prepared by Hamilton and Bennett, and should plan for a takeover some time between April 15 and May 1. As of the close of business April 30 may be the most practical date. (b) Hiring of water superintendent. This should be done as quickly at possible. Responsibility for pushing this la in the hands of Tom Campbell. (*) Accountants to sot up Water District books. Those to be selected by the District. Responsibility for pushing this and getting it done in the hands of Ton Campbell.