Skip to main content

Search the Special Collections and Archives Portal

upr000095 59

Image

File
Download upr000095-059.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000095-059
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    1 2 3 4 5 6 • 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 line* referred to in subparagraphs (a) and (d) of this section wit*| In the period above mentioned, the Union Pacific shall have the right to remove said wire lines and to construct, or arrange with the Southern Nevada Power Company for the construction of, new con sections between the existing power facilities of the District and the power lines of the Southern Nevada Power Company ao as to pro­vide power for the operation of the water production facilities lo­cated upon the land shown tinted, in pink on Exhibit *,A-1W. The Railroad Company shall have the right to construct such facilities upon the property of .the District as shall be nece* sary to connect said new pipe line and new power line connections into the existing facilities of the District. Upon the completion of said work the District shall pay to the Railroad Company, withir thirty (30) days after rendition of bill therefor, the actual cost to Union Pacific and the Southern Nevada Power Company of removing Said pipe lines and wire lines and constructing said new pipe line and said new power line connections plus ten per cent (10#) of sai^ actual cost of construction representing the cost of a upervislon. Section 2: The District agrees that it will, at its sol« cost and expense, and within two years from the sale date, oommenofl and thereafter diligently prosecute to completion the following woi (a) Construct adequate pipe lines to replace the pipe lines referred to in subparagraph (b) of ' this section, which are to be removed by the District. In the event the District desires to construct said pipe lines along and across the property Of Union