Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
1 2 3 4 5 6 • 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 line* referred to in subparagraphs (a) and (d) of this section wit*| In the period above mentioned, the Union Pacific shall have the right to remove said wire lines and to construct, or arrange with the Southern Nevada Power Company for the construction of, new con sections between the existing power facilities of the District and the power lines of the Southern Nevada Power Company ao as to provide power for the operation of the water production facilities located upon the land shown tinted, in pink on Exhibit *,A-1W. The Railroad Company shall have the right to construct such facilities upon the property of .the District as shall be nece* sary to connect said new pipe line and new power line connections into the existing facilities of the District. Upon the completion of said work the District shall pay to the Railroad Company, withir thirty (30) days after rendition of bill therefor, the actual cost to Union Pacific and the Southern Nevada Power Company of removing Said pipe lines and wire lines and constructing said new pipe line and said new power line connections plus ten per cent (10#) of sai^ actual cost of construction representing the cost of a upervislon. Section 2: The District agrees that it will, at its sol« cost and expense, and within two years from the sale date, oommenofl and thereafter diligently prosecute to completion the following woi (a) Construct adequate pipe lines to replace the pipe lines referred to in subparagraph (b) of ' this section, which are to be removed by the District. In the event the District desires to construct said pipe lines along and across the property Of Union