Skip to main content

Search the Special Collections and Archives Portal

upr000140 85

Image

File
Download upr000140-085.tif (image/tiff; 27.28 MB)

Information

Digital ID

upr000140-085
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

\ half of Block 6 and Blocks 7 and 8 taking water from said water mains, which have been constructed, for period of ten years from date of completion of said water mains, or until Subdivider has been repaid the actual cost of all water mains constructed, but in no event in excess of $26,100, whichever occurs first; and providing for future construction of the remaining water mains to serve the balance of the Tract; be, and the same is hereby, ratified, approved and confirmed. Following Authority for Expenditure Requests, approved by the President, were submitted for ratifications A. P. E„ No. 1 (W. Oc #630), issued January 26, 1950; Las Vegas, Nev.; construct 1660 ft. of 6M cast iron water main extensions at Ogden Ave. along.divid­ing lines of lots in Blocks 3 and 4, Amended Church Addition and connected to form circulating system. Total estimated expenditure, $5,960, chargeable to Investment in Water System-Las Vegas, Nevada. Ao F. E. No. 2 (W. 0. #631), issued Jan. 26, 1950; Las Vegas, Nev.; construct 1850 ft. of 6” cast iron water main from connections to 1088 main in Oakey Blvd. along dividing lines of lots in Blocks 1 and 2 of Alta Vista Addition and connected at Canosa' Ave. to form circulating system. Total estimated ex­penditure, $6,300, chargeable to Investment in Water System-Las Vegas, Nevada. A. Fo E. No. 3 (Wo 0. #632), issued F,eb„ 7, 1950; Las Vegas, Nev.j construct 2680 ft. of 1218 cast iron water main in alley east of Main Street near Stewart Avenue and in alley south of Fremont Avenue. Total estimated expenditure, $24,520, chargeable to Invest­ment in Water System-Las Vegas, Nevada. A. F. E. No. 4 (W. 0. #633), issued Feb. 7, 1950; Las Vegas, Nev.; rebuild present 28’ x 14* frame boiler house with new 28* x 14* boiler house using concrete blocks on present concrete floor and founda­tion, steel frame and composition roof. Total esti­mated expenditure $2900; cost of removal of property to be retired chargeable to 0E, $200; credit to In­vestment in R&E for ledger value of property to be retired chargeable as followss Creditable to Misc. Credits to P&L, $10; Auditor*s Suspense, $100; -5