Skip to main content

Search the Special Collections and Archives Portal

upr000280 169

Image

File
Download upr000280-169.tif (image/tiff; 26.62 MB)

Information

Digital ID

upr000280-169
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    Year 1943 1944 1945 1946 11994487 1949 1950 - 2 - W . O . No. Description Amount (Cont' 2013 2029 1337 2013 2029 3 n 80 3 1 8 0 3180 34216810 4261 4500 Replace 934' 24" W.S. pipe between d)settling basin and reservoir. Install power line with transformers and con­struct circuit and install telemeter. 3 0 7 9 Drill 2 additional water wells, Nos. 7 and 8 , construct pipelines and tank, install chlorinator and booster pumps and other facilities. 4 953 Drill 2 additional water wells, Nos. 9 and 1 0 ,construct pipe lines, install additional booster pumping facilities, raise walls of settling basin and in­stall puma on well No. 4. 8 097 Drill 2 additional wells, Nos. 3 and 4, recondition one well and make improve­ments at Middle Spring consisting of retaining wall and cover oioe lines and cleaning out. Cr. 3 958 Drill 2 additional water xtfells Nos. 7 and 8 , construct nine lines and tank, install chlorinator and booster pumps and other facilities. 6 332 Drill 2 additional water wells, Nos. 9 and. 1 0 , construct pipe lines, in­stall additional bolster pumping facil- ties, raise walls of settling basin and install pump on well No. 4. 4 529 Drill additional artesian water well No. 11, construct 1,500,000 reinforced concrete reservoir, settling basin, booster pumphouse, fire pumphouse, pipe and power lines and renew 2228 feet of existing water line. Same as, above Same as above Same as above Construct water booster facilities for Bonanza Village consisting of l6 ' x 24' pumphouse, two electrically operated water pumns two 8 ’x 2 8 ' 3/8 " steel pressure tanks, electric power lines and 1 6 5 7 1 of water pipe line with 1 2 " meter to connect to LVL&W Co Village pipe line near Highway 95- Same as above Construct 1534 feet of 12" transite pipe water line from well No. 8 to the settling basin on Charleston reservoir line. 55 261 16 990 64l045 344 22 5 1 6 2 584 7 644 Total for Year 1 6 1 2 9 6 953 55 990 2 6 1 405 1 6l4 6 344 2 2 1 6 2 1 3 228