Skip to main content

Search the Special Collections and Archives Portal

upr000067 207

Image

File
Download upr000067-207.tif (image/tiff; 33.88 MB)

Information

Digital ID

upr000067-207
Details

Rights

This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

Digital Provenance

Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

Publisher

University of Nevada, Las Vegas. Libraries

(fej Remove from the premises of the Union Pacific the 24-lneh east iron pipe line and the 16-inch transits and east iron pipe line shown in broken red and black lines on said Exhibit *A» and re­store the surface of the lands to the condition existing prior to such removal* (c) Remove the pimping station now located at point HH* The District shall have the right to relocate said pumping station in a new location shown in solid green square on Exhibit near point &* Section 3. In the event the District shall not have commenced to construct the new pipe lines and removed the said existing pipe lines and pumping station as provided in Section Z hereof within two years from the sale date and shall not have two (2) years and completed said work withii/ten (10) months subsequent to the sale date, Union Pacific, after having given the District sixty (60) days* notice in writing of its Intention so to do, shall have the right (a) to construct an adequate pipe line of a capacity equal to or exceeding that of the exist­ing 24-inch oast iron pip® line and 16-inch trans­it ® and cast iron pip® line shown on said Exhibit MAa by broken black and red lines and of a type and else to be mutually agreed upon; and in the event the parties cannot agree upon the character of said proposed pipe line within ninety (90) days after said written notice, the same shall be constructed fey Union Pacific of 39-inch cast iron or pipe of a similar character* Said proposed pipe line shall be constructed in the location shown in broken red and white line between pAo ianntds Vm aarnkde t^ ? and I on said, Exhibit *A»; K 1C — ^ "7 I - 4 *