Skip to main content

Search the Special Collections and Archives Portal

man000205 1

Image

File
Download man000205-001.tif (image/tiff; 27.02 MB)

Information

Digital ID

man000205-001
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    RELOCATION WORK PER AGREEMENT C.L.D Section Description Remarks 5(a) Construct 39* pipe line between points A k V and ¥ k K Under Spec. 1, Fisher Contracting Co. Completed October 13, 1955* 5(b) Construct 24" pipe line between points I I S Under Spec. 1, Fisher Contracting Co. Completed October 13, 1955. 5(c) Construct 8* pipe line between points t it § Under Spec. 1, Fisher Contracting Co. Completed October 13, 1955* 5(d) Relocate pump station from point HH to point near R Removed under Spec. 1, Fisher Contracting Co. Abandoned and not re-installed at point R« Completed October 13, 1955. 5(e) Construct 14" pipe line between points 3, T and U Under Spec, 1, Fisher Contracting Co. Completed.- October 18, 1955. 5(f) Construct 6” pipe line between J & 00 (if not already constructed) Constrffue,c' t"ed prior to purchase* 5(g) Construct power line between points D & T and X & V Not necessary. 5(h) Remove pipe line between points KK & LL Under Spec. 1, Fisher Contracting Co. Completed,- October 18, 1955. 5 (1) Remove pipe line between points II St JJ Under Spec, 1, Fisher Contracting Co, Completed* - October 18, 1955. 5(5) Remove power line between points AA & BB and IT & HH Removed by Southern Nevada Power Co. Complete December 1955, except trans­former pole at old pump sta, site HH, 5(h) Remove power lines, telephone circuits and telemeter wires between points CC & £20 Removed by Southern Nevada Power Co, Complete December 1955, 5(1) Remove pipe lines between points A St 1, A & K, and R & HH All except line between R & HH removed under Spec. 1, Fisher Contracting Co. Completed October 18 1955. Line from R to HH left in at request of U, P., subject to granting of suitable easement.