Skip to main content

Search the Special Collections and Archives Portal

upr000206 41

Image

File
Download upr000206-041.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000206-041
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    F o r m 7 8 0 3 STANDARD 11-24-1000 V, UNION PACIFIC SYSTEM UNION PACTFIC RAILROAD COMPANY OREGON SHORT LINE RAILROAD COMPANY OREGON-WASHINGTON RAILROAD & NAVIGATION COMPANY LOS ANGELES & SALT LAKE RAILROAD COMPANY THE ST. JOSEPH & GRAND ISLAND RAILWAY COMPANY o m a h a , n e b ., April 14, 1925. SUBJECT: Budget Item 98 - ff.O. 4707. Mr. I'. H. Knickerbocker, Gen. Mgr., LA&SL RR Co., Los Angeles C alif. Dear S ir: Referring to your le tte rs of March 18th and 30th with estimate of work to be done under Budget Item 98, on Las Vegas water supply: The estimate shown here is considerably in excess of the budget item owing to operating expense work amounting to $11,995. The settling basin with f i l t e r fo r water softener, amounting to $3330 was recommended by me and your plans and estimates are en tirely in accord with my idea fo r th is work. Under costs of new parts to.replace parts retired, you have a store expense of $1493. I believe this is excessive as th is material would be ordered direct and delivered to the job and it is my under­standing that 1% is allowed to the store on this kind of material. It is my understanding that the estimate which you have submitted covers replacement of old pipe line that was called fo r under Budget Item 228, approved September 18, 1923 and which was not completed. I f this is true, a ll of the work shown in the drawings meets with my approval and has my recommendation. I do not quite understand why some of this work should be carried over into the new budget item inasmuch as the work had been previously approved and work order issued. I may not be quite clear on th is but in any case I would recommend the replacement of the old V.C. pipe by wood stave pipe on account of the d iffic u lt ie s experienced in the past with th is pipe and would also recommend the 24" wood stave pipe called for at the upper end of the lin e , in order to reduce losses in pressure due to fric tio n . Mr. Calvin may wish to submit the work order to me fo r approval a fte r it has been submitted. Yours truly,