Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
More Info
Rights
Digital Provenance
Publisher
Transcription
F o r m 7 8 0 3 STANDARD 11-24-1000 V, UNION PACIFIC SYSTEM UNION PACTFIC RAILROAD COMPANY OREGON SHORT LINE RAILROAD COMPANY OREGON-WASHINGTON RAILROAD & NAVIGATION COMPANY LOS ANGELES & SALT LAKE RAILROAD COMPANY THE ST. JOSEPH & GRAND ISLAND RAILWAY COMPANY o m a h a , n e b ., April 14, 1925. SUBJECT: Budget Item 98 - ff.O. 4707. Mr. I'. H. Knickerbocker, Gen. Mgr., LA&SL RR Co., Los Angeles C alif. Dear S ir: Referring to your le tte rs of March 18th and 30th with estimate of work to be done under Budget Item 98, on Las Vegas water supply: The estimate shown here is considerably in excess of the budget item owing to operating expense work amounting to $11,995. The settling basin with f i l t e r fo r water softener, amounting to $3330 was recommended by me and your plans and estimates are en tirely in accord with my idea fo r th is work. Under costs of new parts to.replace parts retired, you have a store expense of $1493. I believe this is excessive as th is material would be ordered direct and delivered to the job and it is my understanding that 1% is allowed to the store on this kind of material. It is my understanding that the estimate which you have submitted covers replacement of old pipe line that was called fo r under Budget Item 228, approved September 18, 1923 and which was not completed. I f this is true, a ll of the work shown in the drawings meets with my approval and has my recommendation. I do not quite understand why some of this work should be carried over into the new budget item inasmuch as the work had been previously approved and work order issued. I may not be quite clear on th is but in any case I would recommend the replacement of the old V.C. pipe by wood stave pipe on account of the d iffic u lt ie s experienced in the past with th is pipe and would also recommend the 24" wood stave pipe called for at the upper end of the lin e , in order to reduce losses in pressure due to fric tio n . Mr. Calvin may wish to submit the work order to me fo r approval a fte r it has been submitted. Yours truly,