Skip to main content

Search the Special Collections and Archives Portal

upr000174 37

Image

File
Download upr000174-037.tif (image/tiff; 26.42 MB)

Information

Digital ID

upr000174-037
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    OQPX WAALE CAMPLAK ft TIBER*! INC. Las V eg&s, Nevada February 3, 1948 Las Vegas hand and Water Company Las Vegas, Nevada Attention: Hr. Strong Oentleaen; Referenda Is made to your letter dated October 3,.1946, and signed by Walter R. Bracken, In which the Installation of water line for %nansa Village was proposed* you will re©all th^t since that time 1 have discussed with you in your office the possibility of running the 10" and 12* main direct­ly South out of Bonan&a Village to the 24* main, Xou thought that this would be satisfactory as long as we provided the neo ess ary- right of way through the private property* We have had the pipe on order for the past eighteen months and today the first car load of 10* pipe arrived. We arranged to unload this pipe and place it along the proposed new direot route. Inquiry has been made on the tanks and pumps and It appears that there will be no delay on these items. It seems that the horse is before the cart but we are now ready for detail plans on the pump house hook-up and new pipe alignment. Will it be necessary for us to survey the alignment or will you provide for this? We are enclosing blue print of the one tank that we now have In the village and that we plan to use on the new set up* fhe estimated cost of this line is: 3800* of trenching - pipe laying and back fill and tank hook-up 19001 - 12* pipe 1Mi9s0c0e1 l-l an10e*o usp ipvealves, meters, etc, PTuamnpks and Compressor Pump Bouse $25,000,00 $8,360*00 6,802,00 5.358.00 1 ,0 0 0 ,0 0 11.,080000,.0000 1.200*00 copy