Skip to main content

Search the Special Collections and Archives Portal

man000176 151

Image

File
Download man000176-151.tif (image/tiff; 27.02 MB)

Information

Digital ID

man000176-151
    Details

    Rights

    This material is made available to facilitate private study, scholarship, or research. It may be protected by copyright, trademark, privacy, publicity rights, or other interests not owned by UNLV. Users are responsible for determining whether permissions are necessary from rights owners for any intended use and for obtaining all required permissions. Acknowledgement of the UNLV University Libraries is requested. For more information, please see the UNLV Special Collections policies on reproduction and use (https://www.library.unlv.edu/speccol/research_and_services/reproductions) or contact us at special.collections@unlv.edu.

    Digital Provenance

    Digitized materials: physical originals can be viewed in Special Collections and Archives reading room

    Publisher

    University of Nevada, Las Vegas. Libraries

    C o n w a y , M o e , H ib b s & F‘ /TON 0 2 . (1) Acquisition and Construction fund— Reserve for Bond Interest $314.6,000. (2) Acquisition and contruction fund: Organization and Working Capital Reserve 535,000. The $3l|.6,000. reserve for bond interest is designed to meet bond interest dur­ing the construction period in the event revenues from operation during the first year are insufficient for such purpose. If Revenues prove to be adequate, this re­serve may revert to the construction fund. The $535,000. organization and working capital reserve is designed to meet ob­ligations already incurred for legal and engineering costs, to repay County loans, and to provide working capital until such time as a working c apital reserve is built up in the Revenue Fund, In addition to the foregoing, we recommend that that portion of the bond sale proceeds which represents accrued interest from March 1, 19514-3 namely, $814,2466.55, be transferred to the following: (1) Waterworks Bonds, 195U Sinking Fund-Bond Service $8l4,U66.55 After the foregoing transfers, the acquisition and construction fund will re­flect the following: Proceeds of bond sale: Principal Premium Accrued interest Total Deduct Transfers: Reserve fond bond interest 0 & W C reserve Sinking fund—Bond s e rv ic e $8,700,000.00 8,691.38 814,166.55 $8,793,157793 $3146,000.00 535,000.00 814,166.55 965.U66,55 Balance $7,827,691.38 The foregoing amount will then be available for acquisition and construction costs, including the purchase of the existing water system from the Union Pacific Railroad. Your attention is called to the contract provision that your escrow with the sellers, together with a $352,000.00 ’’Relocation Fund” must be opened with­in thirty days after receiving your bond sale proceeds. Appropriate resolutions authorizing the creation of the foregoing funds and the transfers thereto, plus the designation of authorized signatures for disbursement of such funds, should be recorded in your minutes. It is suggested that these resolu­tions include authority for immediate repayment of the County loan with interest, and payment of all outstanding obligations now due. Yours very truly, CONWAY, MOE, HIBBS & FUNST0N .. .. By: Nelson Conway