Information
Digital ID
upr000336-080
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.WELL DRILLING « LOS ANGELES DIVISION Estimate No. % Rosooe Moss C o., Contractors Contract Audit No.3368 August, 19£1. Value of labor and material wrought into w ell at Las Vegas up to and including August 31, 1921: f i r s t 300 f t ................................................. . . . . # 2980.00 v 301 to 500 f t . , in o l., 200 f t & $9.50........... 1900.00 y^ 501 to 780 f t . , in o l., 280 f t & 10.60 ........... 2968.00 ' _ , £ . / / $ 7848.00^ Lesa/25ifc retained 1962.00 BaLanoe f 5886.00 / ''lame previous estimates / Jlo. 1 to No. 7 in ol. 5265.90 / This estimate $ 620,10 Los Angeles, CalJ September 6, Approved; Chief Engineer Approved: vision Engineer p f c O V H lD -