Information
Digital ID
upr000165-015
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.1-7534 \ LVL&WCo. Resolution a On motion duly seconded, It was RESOLVED, that the action of Vice President Strong In executing letter agreement BN nLD 2018, dated February 2, 1948, with Nevada Construction Company, covering construction of approximately 450 feet of cast iron water main from connection with existing water main at north end of Block 25, 14th Street Addition; thence northerly through Block 23 to an end at the north end of said Block 26, Las Vegas, Nevada, to serve D. B. Woody, Subdivider; consideration $562,50; be, and the same is hereby, ratified, approved and confirmed. A true copy. Attest: (Sgd) W. H. Johnson, Secretary Adopted