Copyright & Fair-use Agreement
UNLV Special Collections provides copies of materials to facilitate private study, scholarship, or research. Material not in the public domain may be used according to fair use of copyrighted materials as defined by copyright law. Please cite us.
Please note that UNLV may not own the copyright to these materials and cannot provide permission to publish or distribute materials when UNLV is not the copyright holder. The user is solely responsible for determining the copyright status of materials and obtaining permission to use material from the copyright holder and for determining whether any permissions relating to any other rights are necessary for the intended use, and for obtaining all required permissions beyond that allowed by fair use.
Read more about our reproduction and use policy.
I agree.Information
Digital ID
Permalink
Details
Member of
More Info
Rights
Digital Provenance
Publisher
Transcription
January 23rd, 1953, identified as Dwg A-1080, hereto attached and made a part hereof* The cost of constructing said water mains (exclusive of the cost of constructing the 15 LF of 6” cast iron fire hydrant connections and the 125 LF of 2” copper water line) is the agreed sum of FOUR THOUSAND ONE HUNDRED FORTY & NO/lOO ($4,140.00) DOLLARS the expense of vdiich shall he h o m e hy the Owner. 2, Said water mains shall he cons tructed of 6” cast iron pipe and shall he in accordance with AWWA specifications. All joints shall he cement and all pipe shall he new B & S cast iron, equal to AWWA Class 150. All fittings shall he new, all hell cast iron equal to AWWA Class 150, and all valve boxes shall he of cast iron of appropriate size for each valve. Unless otherwise approved hy a duly authorized representative of the Company, all pipes, valv^ and fittings shall he manufactured hy Pacific States Cast Iron Pipe Company or Mueller Company, All pipe lines shall he chlorinated in accordance with AWWA specifications, shall he subject to the approval and acceptance of State and City Health Authorities, and shall he constructed at an elevation to he designated hy a duly authorize^ representative of the Company, hut in no event shall there he less than 36” of covering over such water mains* All workmanship, material and the installation of said water mains shall he subject to the approval and acceptance hy a duly authorized representative of the Company. 3. At Owner’s sole cost and expense to survey and accurately stake upon the ground the line Along which said water - 2 - A - " * '