Skip to main content

Search the Special Collections and Archives Portal

Search Results

Display    Results Per Page
Displaying results 131 - 140 of 10242

Postcard of Hoover Dam, circa mid 1930s to 1950s

Date

1935 to 1959

Description

Upstream face of Boulder Dam from Arizona side.

Image

Postcard of Hoover Dam, circa mid 1930s to 1950s

Date

1935 to 1959

Description

An artist's rendering of Hoover Dam at night.

Image

Postcard of Hoover Dam, circa mid 1930s to 1950s

Date

1935 to 1959

Description

Boulder Dam from Elks' Point.

Image

Postcard of Hoover Dam, circa 1935

Date

1935

Archival Collection

Description

An image of the Boulder Dam. The name was officially changed to Hoover Dam in 1947. Text from postcard: "Upstream face of Boulder Dam. Note roadway which connects Kingman, Arizona, and Boulder City, Nevada. Six Companies Inc. Photo."

Image

Hoover Dam album, image 010

Date

1931 to 1936

Description

Machinery for construction of Boulder Dam, 1931-1936

Image

Hoover Dam album, image 015

Date

1931 to 1936

Description

Construction of Boulder Dam, 1931-1936

Image

Hoover Dam album, image 016

Date

1931 to 1936

Description

Construction of Boulder Dam, 1931-1936

Image

Hoover Dam album, image 007

Date

1931 to 1936

Description

Construction of Boulder Dam, 1931-1936

Image

The front face of Hoover Dam looking northeast from Hoover Dam, Nevada: photographic slide

Date

1983-08

Description

This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.

Image

The front face of Hoover Dam looking northeast from Hoover Dam, Nevada: photographic slide

Date

1983-08

Description

This series of photographs documents the historic water overflow at Hoover Dam as seen from the Arizona side of the dam. Taken in August of 1983, this overflow marked the first time the spillways were used during a flood. After initially being filled, the spillways were tested once in August of 1941.

Image