p.15 #1075 Temporary cable-way spanning Colorado River, near Look Out Point, provide access to Arizona Spillway operations shown in background. Apr. 1, 1932. p.15 #1076 Skipload of workmen being transported across Colorado River from Arizona side. Apr. 1, 1932.
Pg.44 #2776 Close-up of No. 3 Arizona Intake Tower, showing the cylinder gates being placed. July 24th, 1934. Pg.44 #2775 Close-up of the Arizona Intake Towers, from the High Catwalk. July 24th, 1934.
Pg.97 #3512 Looking upstream in Arizona Valve House. Note three gates and needle valves have been installed. Oct. 29, 1935. Pg.97 #3497 View from top of Boulder Dam, looking toward Power House, Valve Houses and lower portals of Diversion Tunnels. Oct. 28, 1935.
Pg.3 #2301 Hoist house and Nevada Anchorage, Government Cableway. Aug. 9th, 1933 Pg.3 #2310 Trains on Elev. 720 Railroad Bench, hauling concrete to Hoover Dam. August 12th, 1933. Pg.3 #2322 Hoover Dam. August 15th, 1933.